Tapered Issuance Burn
EIP-8363 Draft Standards Track: Core Created 2026-07-14

Tapered Issuance Burn

The transition period, made adjustable. Net consensus-layer yield and annual issuance as the effective base reward factor decays from 128 to 64 over 18 months — driven, as in the EIP, by a single control. Every constant the proposal defines is a slider; the curves and the readouts recompute from the spec's own arithmetic.

Burn fraction b 53.6% of every idealised duty reward
Net yield 2.44% current curve 2.63%
Annual issuance 0.97M ETH current curve 1.05M ETH
Effective factor 128 step 1 of 65 · → 64
Issuance peak 19.8% f* = f_sat · 2^(−4/3)

Net consensus-layer yield

Per staked ETH, per year, after the burn

Net yield against staking ratio

Yield diverges as f → 0; the axis is clipped at the top.

Annual issuance

ETH minted to the staked base per year

Annual issuance against staking ratio

MEV is not issuance, so the overlay does not appear here.

Read the curves as a table

How this is computed

The burn fraction

b = (D / SATURATION_BALANCE)^(3/2), clamped to 1, with D = get_total_active_balance(state). The 3/2 exponent follows from the reward curve's f^(−1/2) shape: the absolute deduction is linear in f, but as a fraction of a reward that itself decays as f^(−1/2) it picks up an extra half power.

The staircase

The effective factor is an integer, so the decay is a staircase — 65 steps of TRANSITION_DURATION_EPOCHS / 64 epochs each, about 8.6 days at the EIP's values. This page reproduces get_base_reward_factor exactly, integer division and all, rather than interpolating between the endpoints.

Issuance arithmetic

Consensus issuance is BASE_REWARD_FACTOR · √D Gwei per epoch at 225 epochs per day, so yield is B · E / √(D · 10⁹). At 40M ETH staked and B = 64 that is 1.05M ETH a year, or 2.63% — the EIP's own figures.

Closed forms behind the readouts

Issuance peaks at f* = f_sat · 2^(−4/3) — independent of B, so it does not move during the transition. The elevated curve crosses today's where b = 1 − B/B_eff, i.e. f = f_sat · (1 − B/B_eff)^(2/3).